Another view of the drainage work near Alloa station site, 8Aug06 2544x1696 |
Drainage trench and pipes, at Alloa, 8Aug06 2544x1696 |
Stock of drainage pipes and new ASDA store progress 2544x1696 |
Looking towards Alloa,behind 'Millionaires' row,8Aug06 2544x1696 |
Drainage pipes near Alloa station site, 8Aug06 2544x1696 |
All the rail access points have these signs, 1728x1152 |
Looking towards Causewayhead, behind 'Millionaires' row, 8Aug06 2490x2247 |
another view of the drainage work, 8Aug06 2544x1696 |
New ballast on top,looking west from Stirling by-pass road, 15Sep06 1728x1152 |
Looking west to Causewayhead, 15Sep06 1728x1152 |
Clipping head at work, on road/rail machine, 15Sep06 1728x1152 |
Road rail machine at work, near Causewayhead, 15Sep06 1728x1152 |
another view of the clipping machine, 15Sep06 1728x1152 |
Looking west, behind 'Millionaires' row, track laid, 15Sep06 1728x1152 |
Looking east behind 'Millionaires' row, 15Sep06 1728x1152 |
close up of steel sleepers, rails clipped in position, more ballast and tamping to come, 15Sep06 1728x1152 |
Track laid at Manor Powis,LC, looking east, 15Sep06 1728x1152 |
Just west of Alloa station site, work ongoing now, 15Sep06 2544x1696 |
Looking west from Alloa station site, 15Sep06 2544x1696 |
The railway now 'Bridged' east of Alloa, for the new road, 15Sep06 584x424 |
The Alloa station layout now taking shape, old track still remaining,just, 15Sep06 2544x1696 |
The new ASDA now opened,very handy for the station, 15Sep06 2544x1696 |
Looking west towards Stirling, from the Stirling by-pass road bridge, rails already in position up to the bridge, 20Sep06 2272x1704 |
Farmers crossing and showing the drainage access, looking west to Stirling, 20Sep06 2147x1619 |
Stirling by-pass, looking east to Alloa,sleepers await the rail, 20Sep06 2272x1704 |
close up of Sleepers laid out, ready for the 'rail', 20Sep06 2272x1704 |
Track machine,'Trac Rail Transposer', pictures tells how the rail is laid in position, 20Sep06 2272x1704 |
Two trac machines are used to lift and lay the rail in the sleepers, 20Sep06 2272x1704 |
Workers follow up the 'trac' machines, and fit the clips to hold the rail in position, 20Sep06 2272x1704 |
158734 passes the Alloa line junction, entering Stirling station,with a Dunblane-Edinburgh service, 17thOct06 3120x1867 |
67004 with 4D05,Inverness-Mossend parcels, approach Stirling station, 17thOct06 3504x2336 |
Alloa line double track, leaving Stirling, 17thOct06 2641x1920 |
View looking west towards Stirling, from Cambus,with the loop point assembled 21stOct06 2544x1696 |
View loking east at Cambus, 21stOct06 2544x1696 |
First photo of the loop at Cambus, under construction, 21stOct06 1831x1266 |
Close up of rail clips and holder,used for the steel sleepers, 21stOct06 2544x1696 |
The loop taking shape at Cambus, 21stOct06 2544x1696 |
The points being assemled at Cambus, for the loop, 21stOct06 2544x1696 |
The end of line, at this date,approaching Alloa Business Park, 21stOct06 1751x1129 |
Looking east towards Alloa station site, 21Oct06 2544x1696 |
View from pedestrian bridge, just before Alloa station site, 21stOct06 2544x1696 |
The Alloa Station site, showing progress to date, 21stOct06 2544x1696 |
Looking west towards origonal Alloa station bridge, 21stOct06 2544x1696 |
Assemled point work, 21stOct06 2544x1696 |
Preparing the next track section, 1Nov06 2544x1696 |
The Kirow crane at work on the pointwork at Cambus, 1Nov06 2544x1696 |
Looking west from Kincardine, the freight line takes shape, 1Nov06 2544x1696 |
Kirow crane 2544x1696 |
| | | |